If you want to succeed in the digital game, your core business data must be right and available everywhere it’s needed, fast.  Learn how Enterprise Data Insight can help you automate your data management and faster processes to transform your SAP Landscape and solve your business challenge

Internation HQ Contact Details
USA HQ

255 S Orange Avenue, Suite 104, Orlando, FL 32801, United States

+1.561.440.8060

EUROPE HQ

71-75 Shelton Street, Convent Garden, London, WC2H 9JQ, UK

+44.2045.770.664

Email and Support contact

info@edatainsight.com

support@edatainsight.com

Schedule 2 – Success Criteria and Scope Declaration
ENTERPRISE DATA INSIGHT
Schedule 2 – Success Criteria

Success Criteria and Scope Declaration Form

This form is completed before delivery begins. It can be saved, shared, and re edited multiple times until final sign off. Draft stage is for scope capture. Final stage is for agreed scope and sign off.

Document: Not saved
Last saved: Not yet
Audit entries: 0
Stage: Draft
Scrambling required: No
Storage: Google
Form id: Not set

0. Engagement

Draft is for scope capture and iteration. Final is for agreed scope and sign off.

1. Company details

Project reference or purchase order is optional during Draft.

2. Mandatory backup requirement

Draft can capture intent. Final expects confirmation and reference.

Customer requirement: The Customer must ensure all relevant SAP systems are fully backed up before installation commences and before any extraction, refresh, or scrambling tasks are performed.

3. System details

Hosting is a dropdown: On prem, Cloud, Hybrid.

SID* Installation number Client* SAP version* Hosting* Remove

4. Scope method

Choose time based scope and or object based scope. At least one must be selected.

5. Time based scope

Each row has automatic reference TB1, TB2 and so on. If Scrambling is Yes for any TB item, scrambling rules are mandatory.

Reference Modules in scope* Notes and details* Scrambling* Excluded modules or fields Remove

6. Object based scope

Each row has automatic reference OB1, OB2 and so on. If Scrambling is Yes for any OB item, scrambling rules are mandatory.

Reference Object in scope* Notes and details* Scrambling* Excluded modules or fields Remove

7. Scrambling options

Mandatory if scrambling is selected for any TB or OB scope line. Applies to is selectable per rule and will show TB and OB items where Scrambling is Yes. If Rule is Fixed scrambling, Note is mandatory.

Applies to* Table* Field* Rule* Note Remove

8. Out of scope

Explicit exclusions. Add line items to confirm exclusions.

Out of scope functionality* Details or description* Remove

9. Assumptions and risks

Draft can be partial. Final should be completed for sign off readiness.

10. Success criteria and acceptance

Draft: capture acceptance statements. Evidence and validated by are typically completed later. Final: evidence, validated by and status are required.

Acceptance statement* Evidence required Validated by Date Status Remove

11. Sign off

Optional in Draft. Required in Final before exporting as final agreed scope.